In this guide: 21 sections
- The answer turns on when you will need the memory
- What to do, in order
- Short answers
- Will Black Friday 2026 bring cheaper RAM?
- Nobody on the record expects cheaper RAM before 2027
- In 2027 the makers expect worse, and one PC maker expects better
- 2028 is the first year any model puts supply above demand, and not every model does
- The forecasts in this cycle have missed low, and the one dip reversed
- Eight different numbers are called the price of RAM
- Waiting pays only if you can wait past the turn: the arithmetic
- Buy two modules, and DDR5-6000 only when it costs what DDR5-5600 costs
- 32GB is the capacity to buy once, because the second purchase is the expensive one
- The platform refresh is real, later than advertised, and does not make memory cheaper
- If what you own works, wait, and give the wait an end date
- Six buyers, and the arithmetic that decides each one
- Prebuilts, bundles and laptops undercut parts until the old stock runs out
- Nine ways to pay less, and two that only look cheaper
- Servers and fleets: bargain over the quote window, not the price
- The turn will show up in a known order, on known dates
- Used memory is priced by the same shortage, and you can read it directly
- Five beliefs about RAM prices that the evidence does not support
Buy RAM when you need it: every named forecast has prices holding or rising through 2026. If you will need the memory within the next year, buy it no later than you need it: no named forecast expects RAM to get cheaper before the end of 2026, all three of the largest memory makers expect supply to be tighter in 2027, and the earliest year any published model puts DRAM supply back above demand is 2028. If the machine you own works and you have no deadline, waiting is sensible, but it pays only if you can go without until late 2028 or later, and then, on the most favorable price path any named analyst has published, it saves about $4.40 to $6.60 for each month you do without a 32GB kit.
Evidence as of November 12, 2026, including TrendForce’s fourth-quarter contract forecast and Micron’s fiscal fourth-quarter results (both September 30), the third-quarter results of SK hynix and Samsung (October 28 and 29), TrendForce’s October releases on notebook costs and cloud spending, its PC DRAM forecast of November 11 and its spot prices of November 12. Every figure names its publisher and date, and where one is worked out here the arithmetic is shown. This site’s own prices move daily, so the text links to the live pages.
The answer turns on when you will need the memory
“Buy now or wait” is really “when will you need it”, because the forecasts disagree about 2028 and very nearly agree about the next twelve months.
| When you will need it | What the dated forecasts imply for that window | What to do | Argued in |
|---|---|---|---|
| Now | TrendForce forecast contract prices up 13-18% in 3Q26 (July 3) and 10-15% in 4Q26 (September 30); no named forecaster expects a fall this year | Buy what you need now, at the speed that costs no more than the slower one | Speed, capacity |
| Within six months | 3Q26 and 4Q26 together about +24% to +36% on TrendForce’s figures, of which only 4Q26 (+10-15%, forecast on September 30) is still ahead of store prices; retail already sits below what the modules cost to replace | Buy now if the money is there and you can test the kit on arrival, since every published path is higher; otherwise buy when you need it, on a dip if one shows on Trends, and do not wait for a trend | 2026, eight prices, arithmetic |
| From six months to the end of 2027 | Server contracts rising every quarter to 2H27 (TrendForce, July 9); the three largest makers expect 2027 tight or tighter; Gartner has DRAM prices up 2% in 2027 after 2026’s rise (via SHI, Aug 14); Acer’s chairman expects PC prices to plateau in 1H27 | Buying early is the cheaper expectation (about $84 to $205 more at Bernstein’s end-2027 peak), weighed against money spent early and a return window that closes before the build; waiting into 2027 for a lower price has no forecast behind it | 2027, arithmetic, track record |
| During 2028 or later, if at all | TrendForce, JP Morgan and Bloomberg Intelligence have DRAM supply catching up with demand in 2028; Citi does not; Bernstein’s price path roughly halves in 2028 and still sits about twice the 2025 level | Wait if the need falls late in 2028 or after, with an end date and three triggers; the saving to the end of 2028 is about $4.40 to $6.60 a month on a 32GB kit | 2028, arithmetic, holding |
| Never, because what you own is enough | Nothing that affects you | Do not pre-buy parts you will not install | Ways to pay less |
On one point the sources agree: there is no relief in 2026, and supply gets no easier in 2027. TrendForce, Micron, Samsung, SK hynix, Winbond, Adata and IDC all say so. The most hopeful executive on record, Acer’s chairman Jason Chen, expects PC prices to plateau in the first half of 2027 and then fall, but even he expects them to keep rising until the end of 2026 (DigiTimes, September).
The common advice to hold for the late-2026 platform refresh does not change this. Intel’s and AMD’s next desktop platforms are both reported to stay on DDR5, so memory bought now carries straight across. The refresh is a reason to wait for a processor, not for memory.
What to do, in order
- Decide your horizon: now, within a year, before the end of 2028, or after it. If the need is within a year and you can test the kit on arrival, buying now is the cheaper expectation.
- If it is late 2028 or after and going without costs you little, wait, and set three triggers with a date to review them.
- Otherwise confirm the capacity with the capacity guide and what your board takes with the CPU index.
- Buy two modules, DDR5-6000 at CL30 to CL36 only when it costs within a few percent of DDR5-5600, on the board’s qualified vendor list (QVL), and enable EXPO or XMP once it is installed.
- Price a prebuilt or bundle before the parts, and check it does not ship a single module.
- Read the cheapest and the median on the 32GB DDR5 kit page, and follow the DDR5 line on Trends week by week.
- If a dip comes and you were going to buy anyway, buy. Do not wait for a second leg down, or push a purchase past its date for Black Friday.
- For servers and fleets, lock the quote, right-size the modules, and defer only what is supportable.
Short answers
| Question | Short answer | Argued in |
|---|---|---|
| When will RAM prices go down? | Not in 2026; the three largest makers expect 2027 as tight or tighter, while Acer, Gartner and Bloomberg Intelligence see relief starting late in 2027 at the earliest; three models have supply catching up with demand in 2028, and a fourth does not | 2026, 2027, 2028 |
| Will Black Friday 2026 bring real deals? | Not as a reason to wait: Black Friday 2025 brought none worth taking, and its quarter is forecast to rise; a bundle, or a short-lived discount on a prebuilt, laptop or kit while PC makers and distributors hold extra stock, is the likelier saving | Black Friday |
| Should I wait for Zen 6 or Nova Lake? | For the processor, perhaps; not for memory, which carries over | Platform refresh |
| Is DDR4 cheaper? | At retail per gigabyte, yes, for now; its chips cost more than DDR5’s | Eight prices; DDR4 vs DDR5 |
| 16GB, 32GB or 64GB? | 32GB as two modules for a new gaming build; 64GB now, as two 32GB modules, if you expect to need it | Capacity |
| Is a prebuilt or laptop cheaper? | Often, while old stock lasts; check for a single module, and buy a laptop with the memory it will need for life | Prebuilts, six buyers |
| Should I buy used, or sell my old RAM? | Used, with buyer protection, against the median; price an old kit on the same pages and sell it when you buy | Used memory |
Will Black Friday 2026 bring cheaper RAM?
Black Friday 2026 falls on November 27, and nothing on the record suggests that waiting for it beats buying when you need it. On Black Friday 2025 Engadget found “there aren’t any promotions worth even considering” (November 28, 2025), with a 32GB Crucial bundle at $322 on Amazon that had cost about $175 a month earlier. Prime Day 2026 (June 23-26) fell between a $374.97 US floor for 32GB of DDR5 in early June (TechTimes) and $379 in late July (Tom’s Hardware, July 28).
This year’s Black Friday also falls in a rising quarter: TrendForce forecast on September 30 that conventional DRAM contract prices rise 10-15% in the fourth quarter, and in mid-September retail was already selling 32GB kits for less than two modules cost on the spot market (the eight prices). A discount has to beat that rise before it saves anything. On November 11, 2026 TrendForce forecast PC DRAM contract prices, which cover the memory in desktops and laptops, up 13-18% in the fourth quarter, and reported that “finished-goods inventories have been gradually rising among OEMs and in North American distribution channels” after some PC brands ordered beyond their actual requirements; its bulletin of October 28 describes PC makers and module houses holding elevated inventory as well. That stock makes short-lived discounts on prebuilt PCs, laptops and some kits possible in Black Friday week: a reason to compare prices that week, not to move a purchase past the date you need it.
- Need the memory before November 27? Buy it when you need it.
- Need it in December anyway? Write down today’s median on the 32GB DDR5 kit page and watch Trends; a deal is one that beats that figure for the exact kit you want.
- Look at bundles. A Newegg processor, board and memory combo in August priced its memory at about $241 against $409 standalone.
- Do not stock up to resell. It has to beat selling fees, shipping and a market whose turns no forecaster has called.
Nobody on the record expects cheaper RAM before 2027
The forecasts for the rest of 2026 are quarterly contract-price calls, and the most cited come from TrendForce, whose DRAMeXchange unit publishes the industry’s reference price series. On July 3 it forecast conventional DRAM contract prices - all DRAM except high-bandwidth memory - up 13-18% quarter on quarter in the third quarter, slowed by consumer buyers “reaching their affordability limit”, not by new supply. On September 30 it forecast 10-15% for the fourth: slower again, but still a rise, with server DRAM undersupplied and PC makers buying ahead of a tight 2027. On November 11 it forecast PC DRAM contracts, one part of that series, up 13-18% in the fourth quarter, “with increases slowing from the previous quarter”, and on November 6 it wrote that DRAM price increases are “expected to gain further momentum in 1Q27”, without a figure.
| Source | Published | 3Q26 call | 4Q26 call | What it measures | Who is speaking |
|---|---|---|---|---|---|
| TrendForce | Jul 3, 2026 | +13-18% | none in this release | Conventional DRAM contract price | Analyst |
| TrendForce | Sep 30, 2026 | - | +10-15% | Conventional DRAM contract price | Analyst |
| TrendForce | Nov 11, 2026 | - | +13-18% | PC DRAM contract price | Analyst |
| TrendForce | Jul 9, 2026 | +13-18% | rising every quarter to 2H27 | Server DRAM contract price | Analyst |
| Adata | Aug 6, 2026 | +20-30% | not given; 2027 tighter | DRAM prices, layer not stated | Module maker |
| Apacer’s chief executive | Jul 24, 2026 | about +30% | not given | DRAM contract price | Module maker |
| Aletheia Capital, via TechRadar | Jun 23, 2026 | about +30% | up to +15% | DRAM prices | Investment firm |
| Unnamed analyst via Jefferies, via TechRadar | Jun 23, 2026 | +40-50% | +30-40% | DRAM prices | One analyst, relayed three times |
The module makers, Adata and Apacer, see the squeeze first and have an interest in firm prices. The top line, “analysts expect another 40-50%”, rests on a single unnamed analyst quoted in a Jefferies report and relayed three times; ten days later TrendForce published 13-18%. Percentages compound: on TrendForce’s figures the contract level at the end of 2026 sits about 24% to 36% above the second-quarter level. The third-quarter part is largely behind us, because store prices have kept pace with contracts (the arithmetic); the fourth-quarter part is still moving toward the shelf.
Sources: TrendForce, 26 Feb 2026 (4Q25: +45-50%); TrendForce, 1 Jun 2026 (1Q26: about +93-98%); TrendForce, 31 Mar 2026 (2Q26 forecast: +58-63%); TrendForce, 3 Jul 2026 (3Q26 forecast: +13-18%); TrendForce, 30 Sep 2026 (4Q26 forecast: +10-15%); TechRadar, 23 Jun 2026 (Aletheia: +30%, then up to +15%; the analyst: +40-50%, then +30-40%). Only 4Q25 and 1Q26 are reported; from 2Q26 on every point is a forecast, because TrendForce has published no realized 2Q26 change. The other two paths start from TrendForce's 2Q26 level, do not say which price they measure, and take Aletheia's 4Q26 at its top, 15%.
Show the figures
| Period | TrendForce, conventional DRAM | Aletheia Capital, 23 Jun | Analyst relayed by Jefferies, 23 Jun |
|---|---|---|---|
| 3Q25 | 100 | - | - |
| 4Q25 | 147.5 | - | - |
| 1Q26 | 288.4 | - | - |
| 2Q26 | 462.8 (forecast) | 462.8 (forecast) | 462.8 (forecast) |
| 3Q26 | 534.6 (forecast) | 601.7 (forecast) | 671.1 (forecast) |
| 4Q26 | 601.4 (forecast) | 691.9 (forecast) | 906 (forecast) |
Spot prices, which move first, cooled in mid-September without a broad fall: TrendForce said on September 16 that “prices for certain chips have begun to show signs of softening”, while the mainstream DDR4 8Gb chip still edged up to $45.54. One week of softening is not a turn, and Acer’s Jason Chen expects PC prices to rise 5-20% toward the end of the year (DigiTimes, via Tom’s Hardware, September 21). No named forecast expects retail RAM prices to fall before 2027. Why contract prices are rising at all is the subject of the shortage explainer.
In 2027 the makers expect worse, and one PC maker expects better
For 2027 the forecasts become statements about supply, and who is speaking matters as much as what is said.
| Forecaster | Role | What was said | Date and route | 2027 direction |
|---|---|---|---|---|
| SK hynix, chief executive Kwak Noh-jung | Supplier | 2027 “the worst year in the industry’s history from the supply perspective”; demand above its capacity “even beyond 2030” | Jul 10, 2026, to Reuters | Tighter |
| Samsung, memory EVP Kim Jaejune | Supplier | Constraints “even more severe in 2027 than 2026”; shortage persists through 2028 | Jul 30, 2026, results call, via The Register | Tighter |
| Micron | Supplier | Tight “beyond calendar 2027”, supply improving gradually in 2028 (June); then “much tighter in calendar 2027 and 2028 than they were in 2026”, DRAM “supply constrained in both years” (September) | Jun 24 and Sep 30, 2026, results presentation and prepared remarks | Tighter |
| TrendForce | Analyst | Sufficiency ratio, its measure of supply against demand (below zero means short), -1% to -2% in 2026, gap widening in 2027 | Jul 30, 2026 | Tighter |
| Winbond | Supplier, older generations | 2027 tighter than 2026 | Aug 6, 2026, via TrendForce news | Tighter |
| Apacer, chief executive C.K. Chang | Module maker | Chip supply to independent module makers could fall to about 30% of the 2026 volume | Jul 24, 2026, via Tom’s Hardware | Much tighter |
| Acer, chairman Jason Chen | PC maker, a buyer | PC prices plateau in 1H27, then fall; cheaper Chinese capacity helps | Sep 21, 2026, DigiTimes via Tom’s Hardware | Easier from mid-2027 |
| Bloomberg Intelligence, Shuli Ren | Analyst | Shortage may have peaked in 2Q26; stabilization by 4Q27; possible oversupply in 2028 | July 2026 research, via 24/7 Wall St (Jul 6) and TechTimes (Aug 18, 2026) | Easing late 2027 |
| Gartner | Analyst | “Any meaningful price relief is not expected until late 2027”; later, DRAM prices up 2% in 2027 after 199% in 2026, on undersupply of 3.6% after 6.9% | Apr 8, 2026, via Evertiq; Aug 14, 2026, via SHI | Flat at the peak |
Micron’s results of September 30 put numbers behind its view: record revenue of $54.23 billion for the quarter to September 3, above its own $49-51 billion guidance, DRAM prices up by a high-teens percentage on the quarter, and a next-quarter guide of $61.5 billion, plus or minus $1.5 billion. It says “we do not have line of sight to when supply and demand will return to balance” and expects “a more moderate rate of price increases”: slower rises, not falls. Samsung’s third-quarter results of October 29 point the same way, with operating profit of KRW 107.4 trillion on sales of KRW 195.3 trillion, against KRW 89.49 trillion and KRW 171.5 trillion in the second quarter, and SK hynix, reporting an 80% operating margin for the quarter on October 28, said it expects demand to exceed supply through 2030.
The buyers do not contradict the sellers. IDC’s February outlook has the PC market falling 11.3% over 2026 as a whole, a figure it repeated on June 2, and rebounding only in 2028; its count for the third quarter alone was down 20.1%, after vendors and channels “loaded up on inventory early in the year to get ahead of price hikes” (October 8). TrendForce’s October 8 release projects notebook shipments down by a low-single-digit percentage in 2027, possibly high-single-digit if component costs keep rising and are fully passed on, and its release of November 11 says earlier price rises led some PC brands to order “beyond their actual requirements”: some PC makers now plan to adjust their memory purchases for 4Q26 and even 1Q27, while memory makers tentatively plan to cut PC DRAM supply in 2027. The dissent comes from a buyer: Acer says memory makers want “to keep their margins as high as possible for longer”, and Acer has an interest in lower prices, exactly as the suppliers have in higher ones.
Behavior is better evidence than talk. Micron said on September 30 it had signed 26 strategic customer agreements, over 35% of its revenue through 2030 and some running into 2031, with three-quarters of that revenue on a defined pricing framework, most of it in bands with a floor and a ceiling for the whole term; SK hynix had 14 on October 28, covering more than half of its 2027 and 2028 capacity, and Samsung 10, with 10 more in talks (Aju Business Daily, via TrendForce, October 29). Winbond says some customers are already negotiating for 2029 and 2030. People who hold order books do not sign five-year supply agreements with price floors when they expect a glut the following year.
2028 is the first year any model puts supply above demand, and not every model does
Three models have DRAM supply catching up with demand in 2028: TrendForce’s, reported by Tom Coughlin for Forbes in August (“2% more supply than demand for DRAM”), JP Morgan’s, in which supply growth beats demand growth by roughly 3 percentage points that year after shortfalls in 2026 and 2027 (MakeUseOf, September 25), and Bloomberg Intelligence’s, reported second-hand. The same MakeUseOf report says Citi’s model keeps DRAM undersupplied in both 2027 and 2028, and Micron’s September 30 outlook has DRAM supply-constrained in 2028 as well. So 2028 is a date three models share, one major bank disputes and the largest US maker does not expect. It is not a consensus. Intel’s chief executive, IDC, AMD’s David McAfee and Nanya put relief in 2028 at the earliest; SK Group’s chairman says about 2030, and Lenovo expects a “new normal” from 2030 rather than a return to pre-crisis prices.
Bernstein’s price path, the only named forecast of a steep fall, puts it in 2028 too. As reported by PC Gamer on July 7, Bernstein expects SK hynix’s DRAM average selling price to reach $1.85 in 2026, peak at $2.23 at the end of 2027 and fall to $1.05 in 2028. ComputerBase reported the same note per gigabit and described the 2027 step as almost 50%, which implies a 2026 level nearer $1.50, so only ratios, which hold either way, are used here: 1.05 / 2.23 = 0.47, a fall of 53% from the peak, which PC Gamer reads as still close to double the 2025 level. A fall of that size has happened before: after the 2017-2018 boom Micron’s DRAM selling price per gigabit fell 30% and 34% in two years (its 10-K for fiscal 2021). But this cycle’s rise is of another order: up about 140% on a year earlier in the first nine months of fiscal 2026 (Micron’s 10-Q of June 25, 2026).
The reason relief waits is physical. TrendForce said on July 30 that construction, equipment installation and raw materials “will delay meaningful production ramp-ups until the second half of 2027”, with substantial output “not expected to materialize until 2028”. A cleanroom opening is not output. The DRAM milestones on record: SK hynix’s first Yongin cleanroom in February 2027; first wafer output at Micron’s ID1 in Idaho and meaningful shipments from its Tongluo fab in Taiwan, both mid-2027; mass production at Samsung’s P5 in the latter part of 2028; first wafer output at Micron’s ID2, late 2028; and SK hynix’s second Yongin DRAM fab, a first cleanroom in June 2029. The shortage explainer covers them fab by fab.
Relief sooner needs demand to break, and the latest evidence runs the other way. TrendForce’s October 14 release has the nine leading cloud providers’ capital spending up 106% to $957 billion in 2026 and above $1.5 trillion in 2027, a further 60%, revised up from 50%, with memory named among the costs pushing AI server prices up. Chinese capacity is the weakest route: investors expect CXMT’s new output to serve mainly China (Commercial Times, via TrendForce, September 24), CXMT is on the Pentagon’s 1260H list, and Lexar’s 32GB DDR5-7200 kit on Chinese DRAM was listed in August at about $592 (3,999 yuan), in line with or only slightly below comparable US kits. The bear cases - an AI slowdown leaving new fabs idle, demand pulled forward by stockpiling - are real, but none on record carries a date or a probability.
NAND is expected to loosen first, in the second half of 2027 (TrendForce, July 30), so SSD and RAM prices may part company then; until then NAND contracts are forecast up 15-20% in the fourth quarter (TrendForce, September 30). The same question for drives is answered in buy storage now or wait, and the sister site tracks SSD prices by price per terabyte.
The forecasts in this cycle have missed low, and the one dip reversed
TrendForce wrote on January 22, 2026 that historical peak quarterly DRAM price rises were “around 35%”. Yet contract prices rose 45-50% in the fourth quarter of 2025 and 93-98% in the first quarter of 2026, a cycle led by cloud providers with “relatively lower sensitivity to pricing” (February 9).
| Who, when | What they called | What happened | Direction of error |
|---|---|---|---|
| TrendForce, Sep 24, 2025 | 4Q25 conventional contracts +8-13% | +45-50% (TrendForce, Feb 26, 2026) | Low |
| TrendForce, Oct 29, 2025 | 4Q25 raised to +18-23% | +45-50% | Low |
| TrendForce, Nov 26, 2025 | 4Q25 +45-50%, two months into the quarter | +45-50% | Right |
| TrendForce, Jan 5, 2026 | 1Q26 +55-60% | +93-98% (TrendForce, Jun 1, 2026) | Low |
| TrendForce, Feb 2, 2026 | 1Q26 +90-95% | +93-98% | Close, slightly low |
| Tom’s Guide, Feb 23 and Apr 1, 2026 | Wait for late spring; then “hold until August 2026” | 32GB DDR5-6000 crossed $400 on Aug 24 | Early |
| A US price-history site, Apr 12, 2026 | 32GB DDR5-6000 at $180-260 by end-2026, called the likeliest case at about 55% | $409 best US price on Sep 14 (Tom’s Hardware) | Low |
| Micron, Dec 2025 then Jun 2026 | Tight “beyond calendar 2026”, then “beyond calendar 2027” | Horizon moved out a year in six months | Late |
| IDC, Feb then Jul 2026 | “Likely to push into 2027”, then “at least 2028” | Horizon moved out | Late |
| Lexar’s ANZ manager, Jun 6, 2026 | Prices double by the end of the year | $374.97 US floor on Jun 3 (TechTimes), $409 on Sep 14 | High so far |
The errors run almost entirely one way: quarterly forecasts revised up within the quarter, relief horizons moving outward, and every dated stabilization call failing. The fourth quarter of 2025 came in at 4.5 times TrendForce’s first forecast rise, on midpoints. None of this proves the 2028 models wrong, but in this cycle a relief date has been better read as the earliest it could happen than as a central estimate.
The one real fall came in March 2026, when some 32GB DDR5 kits fell as much as 30% while the DDR5 chip spot price slipped about 5% (DigiTimes via Tom’s Hardware and TechSpot, April 10). DigiTimes put it down to distributors selling stockpiles and to Google’s TurboQuant announcement, which prompted some to clear stock. A Corsair Vengeance 32GB kit fell from a $500 high to $369 at Amazon (Tom’s Guide, April 1). Contract prices never paused: TrendForce forecast +58-63% for the second quarter on March 31, the cheapest US 32GB DDR5-6000 kit crossed $400 by August 24 (Tom’s Hardware), and the DDR5 16Gb spot average was $57.667 on September 24, 55% above April’s low. IDC’s Tom Mainelli had called it “far from normalization” (PCWorld, April 20). The dip was worth (500 - 369) / 500 = 26% to a buyer who bought before mid-April, and nothing to one who waited for a second leg down. Treat a dip as a chance to make a purchase you were going to make anyway, not as the start of a trend.
Eight different numbers are called the price of RAM
In September a 32GB DDR5 kit was quoted anywhere from about $390 (a DDR5-5200 kit with a coupon, Tom’s Hardware, September 8) to about $604 (Capital and Compute’s tracker average, September 25), and nobody was wrong. They measured different things.
| Layer | Example (source, date) | Use it for |
|---|---|---|
| Contract | +13-18% forecast for 3Q26 (TrendForce, Jul 3); DDR5 8GB SODIMM at $130, or $16.25/GB (TrendForce contract table, late Jul) | Direction, months ahead of the shelf |
| Chip spot | DDR5 16Gb at $57.667 (DRAMeXchange, Sep 24) | The earliest sign of a turn; a thin market |
| Module spot | DDR5 16GB UDIMM at $235.667 (DRAMeXchange, Sep 14) | Replacement cost of what is on the shelf |
| Retail cheapest | $389.99 with a coupon, a DDR5-5200 kit (Tom’s Hardware, Sep 8) | The floor, usually set by a slow kit |
| Retail best, one specification | $409 for 32GB DDR5-6000 (Tom’s Hardware index, Sep 14) | Pricing the kit you would actually buy |
| Tracker median | About $470 across seven kits (BottleneckPC, mid-Sep) | What a typical kit costs |
| Retail average | $572 for 2x16GB DDR5-6000 (PCPartPicker, Aug 2026) | Year-on-year change; inflated by premium kits |
| Used, per GB, before shipping | The median on this site’s pages | The one market you can read directly |
Use the cheapest and the median for the exact thing you would buy, and treat every forecast here as a contract percentage that has to be translated before it means anything at the register. On one consistent measure a year apart (PCPartPicker averages, compiled by Tom’s Hardware on August 17), DDR5 kits multiplied about twice as fast as DDR4 kits:
| Kit, PCPartPicker average | Aug 2025 | Aug 2026 | Change | Per GB, Aug 2026 |
|---|---|---|---|---|
| DDR5-6000, 2x16GB | $108 | $572 | 5.3 times | $17.88 |
| DDR5-6000, 2x32GB | $222 | $1,272 | 5.7 times | $19.88 |
| DDR4-3200, 2x16GB | $105 | $281 | 2.7 times | $8.78 |
| DDR4-3200, 2x8GB | $63 | $163 | 2.6 times | $10.19 |
Two same-day comparisons show the near-term retail risk.
Sep 14, 2026, same day
module spot, DDR5 UDIMM 16GB 2 x 235.667 = 471.33 USD 14.73 USD/GB
retail best price, 32GB DDR5-6000 409.00 USD 12.78 USD/GB
retail / module spot 409 / 471.33 = 0.868 13% below spot
retail 16GB kit 239 / 16 = 14.94 USD/GB level with spot
Nov 12, 2026, chip spot per bit
DDR4 16Gb 79.75 / DDR5 16Gb 60.233 = 1.32 DDR4 chips 32% pricier
On September 14 the best US price for 32GB of DDR5-6000 was 13% below the spot cost of two 16GB modules, slower ones at that. Retail is selling memory for less than it costs to replace; TrendForce’s September 22 release on module makers shows how, with Adata’s 2025 profits up partly on low-cost inventory from the previous cycle. When that stock runs out, retail reprices toward replacement cost; Lexar’s Australia and New Zealand manager said industry costs take up to eight to nine months to reach consumer prices (Tom’s Hardware, June 6), one executive’s view. The same lag explains the DDR4 comparison: chips 32% more expensive per bit than DDR5’s, kits at retail less than half DDR5’s price per gigabyte. Staying on DDR4 is covered in the DDR4 guide.
Waiting pays only if you can wait past the turn: the arithmetic
One real purchase runs through this section: a 32GB DDR5-6000 kit at the $409 best US price of September 14. A later reading ran higher ($429 for the cheapest 32GB kit of any speed on Capital and Compute’s tracker, September 25), so the dollar figures may be low. It is a method, not a prediction; the price you would pay today is on the 32GB DDR5 kit page.
1. Has retail followed the contract path?
contract, 3Q25 level to 3Q26 level (conventional DRAM)
low 1.45 x 1.93 x 1.58 x 1.13 = 5.00
mid 1.475 x 1.955 x 1.605 x 1.155 = 5.35
high 1.50 x 1.98 x 1.63 x 1.18 = 5.71
(4Q25 and 1Q26 reported; 2Q26 and 3Q26 are forecasts)
retail, PCPartPicker 2x16GB DDR5-6000, Aug 2025 to Aug 2026
572 / 108 = 5.30
2. Waiting to the end of 2026, kit at 409 USD
(already at the 3Q26 contract level on step 1's reading)
TrendForce 4Q26, Sep 30 409 x 1.10 = 450 409 x 1.15 = 470 +41 to +61
retail up to module spot 2 x 235.667 = 471 +62
Jefferies-relayed 4Q26 409 x 1.30 = 532 409 x 1.40 = 573 +123 to +164
a spring-2026-style dip 409 x 0.74 = 303 about -106
3. Waiting to the end of 2027 or 2028, Bernstein's path, ratios only
2028 against the 2027 peak 1.05 / 2.23 = 0.471 (-53%)
2027 peak against 2026, two readings 2.23 / 1.85 = 1.205 or about 1.50
kit at the end-2027 peak 409 x 1.205 = 493 409 x 1.50 = 614 +84 to +205
kit at end-2028 409 x 1.205 x 0.471 = 232 409 x 1.50 x 0.471 = 289
saving 409 - 289 = 120 to 409 - 232 = 177
months, Oct 2026 to Dec 2028 = 27
saving per month 120 / 27 = 4.4 to 177 / 27 = 6.6 USD
as a share of 409 120 / 409 = 29% to 177 / 409 = 43%
against the Aug 2025 average 232 / 108 = 2.15 289 / 108 = 2.68 times
Step one is the cross-check that makes the rest usable: compounded contract figures rose 5.0 to 5.7 times over the year and PCPartPicker’s retail average 5.3 times, so applying contract percentages to a kit price is justified, and a September price already contains the third quarter’s rise.
Step two prices a wait to the end of the year. On TrendForce’s fourth-quarter forecast the kit costs about $41 to $61 more, close to the $62 that retail catching up with the spot cost of two modules would add on its own. Beyond December TrendForce gives a direction without a figure, increases “expected to gain further momentum in 1Q27” (November 6), so a saving comes only if a dip like the spring’s recurs and is bought.
Step three is the only route to a saving, and it needs a long wait. On Bernstein’s ratios the kit costs about $232 to $289 at the end of 2028, a saving of $120 to $177 over 27 months, roughly $4.40 to $6.60 a month, or 29% to 43% off. Three things qualify it: Bernstein’s figure is a chip selling price, not a retail price; on a lag of up to eight to nine months, a chip-level fall in 2028 may reach shelves only in 2029; and even then the kit costs 2.15 to 2.7 times PCPartPicker’s August 2025 average.
The same numbers settle the case of a buyer who knows a build is coming, such as one planned around Nova Lake or desktop Zen 6. No named forecast has memory cheaper within twelve months; Bernstein’s path puts the kit at $493 to $614 at the end-2027 peak, and Gartner’s gentler one, up 2% in 2027, still has no fall. For a need within about a year, buying early is the cheaper expectation. Test the kit on arrival, since the return window starts at purchase, and buy a mainstream kit, because the new platforms’ memory support is unpublished.
Wait only if you can go without the memory until the end of 2028 or later, and going without is worth less to you than about five dollars a month. Otherwise buy no later than you need it.
Buy two modules, and DDR5-6000 only when it costs what DDR5-5600 costs
DDR5-6000 has real support on AM5: AMD’s own EXPO testing uses 32GB of DDR5-6000 on a Ryzen 7 9700X, and TechSpot found DDR5-8000 barely ahead of a tight DDR5-6000 kit, because above about DDR5-6000 the memory controller drops to half the memory clock (the speed guide explains why). But it is an overclock, not AMD’s specification. AMD’s pages for the Ryzen 5 9600X and Ryzen 7 9800X3D list DDR5-5600 with two modules and DDR5-3600 with four, and AMD says memory run outside its published specifications “will void any applicable AMD product warranty”. On Intel, the Core Ultra 9 285K page says “Up to DDR5 6400 MT/s”, but the datasheet, as Tom’s Hardware read it, rates Arrow Lake at DDR5-5600 with standard modules and the Arrow Lake Refresh at DDR5-7200 with CUDIMMs on a board with one slot per channel; with four modules the rating drops to DDR5-4800 for single-rank and DDR5-4400 for dual-rank modules. Then the price test:
| Speed | AMD AM5, two modules | Intel Arrow Lake | 32GB price (source, date) | Measured effect (source) |
|---|---|---|---|---|
| DDR5-4800 | Within specification | Four-module single-rank rating | $359 (Tom’s Hardware, Aug 24) | - |
| DDR5-5200 | Within specification | Within standard-module rating | - | A 6000 CL36 kit up to 17% ahead of an entry 5200 CL40 kit in Cyberpunk 2077, Ryzen 7 9700X (TechSpot, Feb 2026) |
| DDR5-5600 | AMD’s official maximum | Official for standard modules | $409 (Tom’s Hardware, Sep 14); $409.99 CL40 (Sep 17) | The baseline |
| DDR5-6000 | EXPO overclock; controller still 1:1 | XMP overclock on standard modules | $409 (Tom’s Hardware, Sep 14) | CL30 about 5% ahead of 5600 in Horizon Zero Dawn, 9700X (TechSpot, Apr 2025) |
| DDR5-6400 | EXPO overclock | Official with CUDIMMs on one-slot-per-channel boards | $420 CL32 (TechSpot build guide, Jun 29) | TechSpot’s pick for Zen 5, a minority view |
| DDR5-6600 | EXPO overclock | XMP overclock | $655 (Tom’s Hardware, Sep 14) | No measured gain in the tests cited here |
On September 14 the 5600 and 6000 kits had the same best US price, and on September 17 a faster kit cost 2.4% more, for a gain TechSpot measured at about 5% (6000 CL30 against 5600) on a non-X3D Ryzen. The gain is much smaller on X3D chips: TechSpot’s July test of AMD’s tighter EXPO profiles found 1-2% in three of five games on a 9800X3D, and 9% and 11% only in the two most processor-bound. Timings matter less than people pay for: TechSpot found a DDR5-6000 CL36 kit essentially matched a premium kit in games (the latency guide converts CL into nanoseconds). Buy DDR5-6000 at CL30 to CL36 when it costs within a few percent of DDR5-5600; otherwise buy the 5600 kit, and never pay a large premium for anything faster. Buy it as two modules, because four cut AM5’s official speed by 36%. Check the part number against the board maker’s QVL before buying, and enable EXPO or XMP in the BIOS afterward, since DDR5 runs at its standard speed until a profile is on. Prices by speed are on the DDR5-6000 page and the DDR5-5600 page, which mix laptop and desktop modules, so for a desktop pick the speed on desktop DDR5.
32GB is the capacity to buy once, because the second purchase is the expensive one
At the September 14 index the 2x16GB kit was the cheapest DDR5 capacity per gigabyte.
| Kit | Best US price, Sep 14 (Tom’s Hardware) | Per GB | Premium per GB over 32GB |
|---|---|---|---|
| 16GB DDR5-6000 | $239 | $14.94 | +17% |
| 32GB DDR5-6000 | $409 | $12.78 | - |
| 48GB DDR5-6000 | $661 | $13.77 | +8% |
| 64GB DDR5-6000 | $889 | $13.89 | +9% |
| 96GB DDR5-6000 | $1,699 | $17.70 | +38% |
| 128GB DDR5-6400 | $2,339 | $18.27 | +43% |
The optimum moves: in late July 64GB was the cheapest per gigabyte, $10.92 against $11.84, so read the per-gigabyte sort on the 16GB kit, 32GB kit and 64GB kit pages rather than a rule of thumb. The buy-once argument comes from the platform: capacity is bought as two modules, so a 2x8GB kit is replaced later rather than added to. At September 14 prices the step from 16GB to 32GB cost (409 - 239) / 16 = $10.63 per extra gigabyte, and from 32GB to 64GB (889 - 409) / 32 = $15.00, against a second full purchase later; 96GB cost $25.31 per extra gigabyte, so it is for a measured need. With an 8GB graphics card, going from 16GB to 32GB improved the 1% lows of an RX 9060 XT by more than 60% in Spider-Man 2 (TechSpot, January 8, 2026). Sizing by workload is the subject of how much RAM you actually need.
The platform refresh is real, later than advertised, and does not make memory cheaper
Intel’s chief executive said on January 22, 2026 that Nova Lake is “coming at the end of 2026”; a leaked slide puts the first desktop parts in the first quarter of 2027, and DigiTimes reported “major annual products” in March 2027 after a CPU price rise of about 10%. For a mainstream Nova Lake processor the reports point to spring 2027. AMD launched Zen 6 in servers first; its desktop Ryzen 10000 family is reported for 2027 (Benchlife, DigiTimes), AMD has announced no date, and AMD says AM5 support runs through 2029.
| Platform | Status, late September 2026 | Memory | Date and its status | What you keep if you buy now |
|---|---|---|---|---|
| AM5, Zen 5 (Ryzen 9000) | On sale | DDR5 | Support through 2029 (AMD, announced) | Board, memory, cooler |
| AM5, Zen 6 desktop | Not announced | DDR5, per leaked documentation | 2027 (Benchlife, DigiTimes: reported) | Board and memory, if the reports hold |
| LGA1851, Arrow Lake Refresh | On sale since March 2026 | DDR5 | 270K Plus from $289-299 to $339-349 by July (Tom’s Hardware, July 2) | Memory and cooler, not the board |
| LGA1954, Nova Lake-S | Not announced | DDR5, reportedly to 8000 | End of 2026 (Intel CEO, company statement); 1Q27 first parts (leak); March 2027 (DigiTimes, report) | - |
| LGA1700, Raptor Lake | On sale | DDR4 or DDR5 boards | Kept “for years to come” (Robert Hallock, now at Intel, Aug 2026); a third refresh in 1H27 (rumor) | Board and memory of either generation |
| AM4 | On sale | DDR4 | 5800X3D anniversary edition $349 from June 25; Ryzen 5 5500F $99 in Sep (AMD, announced) | Board and DDR4 |
Both next desktop platforms are reported to stay on DDR5, so memory is the one component that gains nothing from waiting for them. New processors arrive expensive: Intel raised the recommended price of the Core Ultra 7 270K Plus about 17% within four months of its March launch. What Intel keeping LGA1700 alive means for DDR4 owners is in the DDR4 guide.
If what you own works, wait, and give the wait an end date
TechSpot strongly recommended on July 15 not buying DDR5 memory, “or possibly any DRAM, if you can avoid it”, and its June buying guide advised owners of capable AM4 or LGA1700 systems to make “a targeted CPU or graphics card upgrade” instead. But a wait needs an end date, or it becomes indecision. Set three triggers:
- The launch of Nova Lake or desktop Zen 6, with memory support stated by the vendor and independent reviews.
- A TrendForce quarterly DRAM contract forecast that is flat or negative, which none has been since its forecast for the second quarter of 2025.
- The median on the 32GB DDR5 kit page, or the DDR5 line on Trends, falling for several consecutive weeks below a figure you write down today.
While waiting, check whether the machine is short of memory at all, and fill an empty channel before replacing modules that work.
Six buyers, and the arithmetic that decides each one
A first PC, needed now. Buy now. In TechSpot’s June 2026 guide, 16GB of DDR5-6000 at $245 was 31% of a $786 entry build. Take 2x8GB only if the budget forces it, and price the replacement in: $239 now plus a 32GB kit later, against $409 once.
A gamer on a working AM4 or LGA1700 machine with DDR4. Hold. If the processor is the bottleneck, Tom’s Hardware judged AMD’s $349 Ryzen 7 5800X3D sensible only for someone who already owns an AM4 board and DDR4, and found that a Ryzen 5 7600X3D plus 16GB of DDR5-6000 cost only about $80 more than the 5800X3D alone, before the AM5 board (June 25).
A gamer with 16GB, an 8GB graphics card, and stutter. Buy the capacity now: the 32GB kit costs $409 less whatever the old kit sells for, and waiting to the end of the year adds about $41 to $61 while the stutter continues.
A laptop buyer. Buy when you need it, with the memory in the configuration, because many thin laptops cannot be upgraded. TrendForce calculated on September 4 that a $900 notebook of early 2025 would need to cost about 80% more to keep its margin, and on October 8 put the processor, DRAM and SSD at about 68% of a mainstream $900 notebook’s bill of materials, warning that brands may pass more of it on. On the 5-20% rise Acer’s chairman expects by year-end, a $1,000 laptop becomes $1,050 to $1,200. Memory added at purchase is steep: 8GB more on Apple’s M6 Mac mini costs $200, $25 per gigabyte. Whether a laptop’s memory is socketed is covered in how to check what RAM fits.
An office with 20 desktops due for refresh. Extend where the fleet is supportable and buy the rest under a locked quote. The memory in 20 new 16GB machines is 20 x 239 = $4,780, which bounds what deferring the memory could save. Deferring has its own cost once a machine falls out of security support: Windows 10 Extended Security Updates cost organizations $61 per device for the first year, doubling each year for at most three years, and a device enrolled late pays for the years it missed (Microsoft Learn). The years run from October 2025, so for a desktop that cannot run Windows 11, cover to October 2027 costs 61 + 122 = $183 and to October 2028, 61 + 122 + 244 = $427; for 20 machines, $3,660 and $8,540.
A homelab or small server that needs 256GB or more. The memory generation decides more than the timing.
Server memory per GB, September 2026
DDR4 RDIMM 5.56 eRacks median of lowest street prices (seller's tracking)
DDR4 ECC 9.34 DatacenterDisk median (small sample of new listings)
DDR5 RDIMM 31.05 eRacks median
DDR5 RDIMM 41.09 DatacenterDisk median
DDR5 RDIMM 64.06 32GB module spot, 2,050 / 32 (DRAMeXchange, Sep 14)
256GB of it
DDR4 256 x 5.56 = 1,423 256 x 9.34 = 2,391
DDR5 256 x 31.05 = 7,949 256 x 64.06 = 16,399
By either tracker DDR5 server memory costs 4.4 to 5.6 times as much per gigabyte as DDR4, which outweighs anything the timing can do. Prices by generation are on the DDR4 registered page and the DDR5 registered page.
Prebuilts, bundles and laptops undercut parts until the old stock runs out
Deals from late August and September show whole systems selling for less than their parts.
CyberPowerPC, Ryzen 7 9800X3D, RTX 5080 FE, 32GB DDR5, 1TB SSD 2,299
graphics card 1,579 + processor 449 2,028
left for memory, SSD, board, power supply and case 271
HP Omen 35L at Walmart against HP's own site
(3,639.99 - 1,899.99) / 3,639.99 = 48% less
Newegg 9800X3D + X870E board + 32GB DDR5-6000 combo
memory effectively 489.99 - 248.99 = 241
against the best standalone 32GB price, Sep 14 (409 - 241) / 409 = 41% less
Alienware Aurora, July 2025 to July 2026 1,999 / 1,099 = 1.82
The first three are Tom’s Hardware deal reports of September 21, September 25 and August 20. System makers buy memory on contract, and some of what they sell was built from parts bought before the steepest rises. TrendForce said on September 4 that this buffer “will diminish”, and the repricing has started: the Alienware Aurora above went from $1,099 to $1,999 in a year, and Apple took the 13-inch M5 MacBook Air from $1,099 to $1,299 on June 25. Two checks apply: some prebuilts ship a single memory module, which costs 8-10% of gaming performance on most processors (Tom’s Hardware, July), and many thin laptops’ memory is soldered. Buy the prebuilt or bundle while the old stock lasts, if it contains what you would have bought anyway. Socketed laptop memory is on the DDR5 laptop page.
Nine ways to pay less, and two that only look cheaper
- Buy the speed the price allows. DDR5-6000 only at or within a few percent of the 5600 price, as the speed section sets out.
- Accept CL36. The CXMT-based CL36 kit in TechSpot’s February test matched premium memory in games.
- Skip the premium brand. Newegg’s July 9 guide priced a Patriot Viper Venom 32GB DDR5-6000 CL30 kit at $399.99, and the same page showed a G.Skill Trident Z5 Neo kit of the same specification at $649.99 on September 26; the prices are eleven weeks apart, so compare brands at the same capacity, speed and latency on the per-gigabyte sort before paying for a name.
- Buy a bundle, if you need the processor and board anyway. The Newegg combo in the prebuilts section priced the memory at $241.
- Buy a prebuilt, on the terms of the prebuilts section.
- Buy one DDR5 module now and a matched kit later. Tom’s Hardware measured on July 31 that one 16GB DDR5 module loses 8-10% of gaming performance against 2x16GB on most processors (10.9% on a Ryzen 5 7600X, 2.8% on a 9800X3D) and still beats dual-channel DDR4. Sticks bought separately are not validated together, so it suggests buying a matched kit later and selling the single module. Single modules are filtered on the 16GB module page.
- Buy used, with buyer protection, against the page’s median. The tests and the checks are in the used-RAM guide, and a specific part is easiest to follow on the part-number index. Crucial kits still on sale are old stock: Micron stopped shipping Crucial products to the consumer channel at the end of February 2026 and said it would keep supporting their warranties (Micron, December 3, 2025).
- Keep the machine and upgrade the processor or graphics card instead, as the hold section sets out.
- Reuse memory you own. Custom builder Maingear started accepting new, used or pulled DDR5 kits in December 2025, after its own cost for a 32GB kit rose 394%. Mixing rules are in how to check what RAM fits.
Two offers only look cheaper. V-Color’s “1+1” packs pair one real module with a non-functional lit filler: the 16GB DDR5-6000 CL30 version cost about $285 in the UK (£210, Tom’s Hardware, September 4), or 285 / 16 = $17.81 per real gigabyte against $12.78 for a 32GB kit. And HUDIMM, a half-width DDR5 module introduced in April 2026, halves bandwidth and capacity, so it saves only if its price per gigabyte is lower.
Servers and fleets: bargain over the quote window, not the price
TrendForce expects server DRAM contract prices to keep rising every quarter through the second half of 2027, with the increases falling mainly on “customers without LTAs”, the long-term agreements the largest buyers have signed (July 9). Vendors’ terms moved faster than their prices: HPE cut quote validity from 30 to 14 days in February, then restored 30-day quotes in June and from August 5 honored quoted prices on orders up to $1 million (The Register). SHI, a large US IT reseller, advised on August 14 that organizations “may opt to order 6 to 12 months ahead of required deployment dates”. The lever a server buyer has in 2026 is the quote window, not the price; the others are right-sizing, as cloud providers have done by moving some systems from 96GB and 128GB modules to 32GB and 64GB ones, deferring what is supportable, and reusing older memory. How many modules a server takes is in the server capacity guide, module types in registered against unbuffered, and memory for specific models in the compatibility index and on the DDR5 server page.
The turn will show up in a known order, on known dates
If prices turn, the signals should arrive in roughly this order.
| Signal | Where it is published | What a turn looks like | Lead over retail |
|---|---|---|---|
| Chip spot | TrendForce’s DRAMeXchange price page; a weekly commentary, recently on Wednesdays | Several consecutive weeks of lower DDR5 16Gb averages, not one “cooling” note like the one of Sep 16 | Earliest; Silicon Analysts, a small analysis site, found chip spot quotes rising above module quotes led module prices by about two to four weeks (Aug 28) |
| Module spot | The same page | The DDR5 16GB UDIMM average falling | Weeks |
| Supplier inventory | TrendForce’s quarterly revenue releases | “Historic lows” (September 7) giving way to rising stock | Months |
| Monthly contract | TrendForce’s monthly contract-report abstracts | “Rising chipmaker quotes” (August 31; “gains have narrowed” on July 31) giving way to flat months | Months |
| Quarterly contract forecast | TrendForce press release near each quarter turn | A flat or negative range | Months |
| Makers’ guidance | Micron, Samsung, SK hynix results | “Tight beyond 2027” softening; capital spending cut | Months |
| Retail | Tom’s Hardware’s RAM price index and PCPartPicker’s price history; the new rows on the 32GB DDR5 kit page and the like-for-like DDR5 line on Trends | First the cheapest kit, then the median, falling for weeks | - |
| Systems and used | Maker price lists; this site’s used rows | Price cuts and restored configurations | Last |
TrendForce’s quarterly DRAM contract releases came on January 5, March 31, July 3 and September 30, 2026, so a first-quarter 2027 release around the turn of the year would fit the pattern - an inference, not an announcement. The next maker figures are due on dates not yet announced: Micron’s fiscal first-quarter results in mid to late December, against its guide of $61.5 billion, plus or minus $1.5 billion (it reported the year-earlier quarter on December 17, 2025), and SK hynix’s and Samsung’s fourth-quarter results, usually in late January. Still unknown: the launch dates and memory support of Nova Lake and desktop Zen 6, whether CXMT’s memory is cleared for US buyers, and tariffs. The chip tariff proclamation of January 14, 2026 exempted imports for consumer uses, so memory kits and consumer PCs were not its target, but EY’s summary (February 9) leaves room for “significant broader tariffs” later, undated - a reason to watch the news, not to buy early.
Used memory is priced by the same shortage, and you can read it directly
Every listing page here ranks by price per gigabyte before shipping, shows the
shipping beside each row, states the cheapest and the median, and compares Buy
It Now prices by default (?bids=show adds bid-only auctions, ?auctions=no
removes auctions). A
2x16GB kit is on the 32GB DDR5 kit page, one part
across sellers under the part index, and DDR5 beside DDR4
kits on the all-generations
page.
Track the median, not the cheapest row, and when you compare it with store prices, add the shipping shown beside any row you mean to buy, because the median is the item price. Trends does the week-by-week part, with a like-for-like price per gigabyte, also before shipping, recorded since October 3, 2026. Do not anchor to an all-time low: Tom’s Hardware lists an undated US low of $72 for 32GB of DDR5-6000, and the September price was 5.7 times that, so waiting for it is waiting for the pre-shortage market. To price a kit you would sell, read the used rows near the median on the 16GB DDR5 kit page (or the DDR4 one), and sell it the month you buy. Counterfeit DDR5 laptop modules with dummy chips circulated on Japanese second-hand marketplaces in May 2026 (Tom’s Hardware, May 11), so test what arrives; the used-RAM guide shows how.
Five beliefs about RAM prices that the evidence does not support
“The new fabs will fix it in 2027.” TrendForce expects substantial output only in 2028, and the most quoted “December 2028” cleanroom is SK hynix’s M17, a NAND fab.
“China will flood the market.” Investors expect CXMT’s new output to serve mainly China. The strongest counterpoint: CXMT says its G5 platform is in mass production with at least 50% more dies per wafer (Reuters, via TrendForce, September 20), and Acer expects Chinese capacity to help by late 2027; Adata expects no material difference in 2027.
“DDR4 is a safe haven.” PCPartPicker’s US averages for six DDR4 kits rose 120% to 177% between August 2025 and August 2026, the two DDR4-3200 kits in the year-on-year table by 159% and 168% (Tom’s Hardware, August 17). DDR4 vs DDR5 covers when it is still the right buy.
“Gartner says DRAM prices will rise 130%.” That figure, of February 26, is DRAM and SSD prices combined. Gartner’s DRAM-only forecast of April 8 put 2026 at 125%, and August relays put it at 199% (SHI, August 14) and 271% (The Register, August 6), which disagree. The April forecast said “any meaningful price relief is not expected until late 2027” (Evertiq); that marks when relief might begin, not a return to old prices.
“Prices will go back to 2024 levels.” No named model says so. IDC’s model “does not point to a reversion to 2025 pricing levels within the forecast horizon”, Micron expects its cost per bit to rise, and Bernstein’s 2028 price is still about twice 2025’s.